Ongoing Project Details of GEM Consultants Limited

(Civil Engineering Consultancy)

S – 1

Project Title

Consulting Services for Road User Satisfaction Survey and Progress Assessment through Result Monitoring Framework for “Western Economic Corridor and Regional Enhancement (WeCARE) Program”

Location

Jashore, Jhenaidah, Magura, Chuadanga, Shatkhira and Khulna, Bangladesh

Start Date

February 2022

Completion Date

Ongoing

Description

The proposed program aims to work on upgradation and improvement of national highways along with utilities for improved digital connectivity, development of complementary infrastructure and services along with upgradation of trunk infrastructure that would contribute to serving selected markets. The program is envisaged to be implemented in multiple phases for a period of around 10 years. RHD has established a Project Steering Committee (PSC) for strategic guidance, an independent Project Implementation Unit (PIU) and Project Implementation Committee (PIC) for coordination, implementation and other support functions. The project is likely to require significant amount of land acquisition and resettlement as the highway to be upgraded through this project will be widened to a six-lane facility.

S – 2

Project Title

Review of Pavement, Bridge, Culvert Design and Supervision of Construction Works for Widening the Barayerhat – Heanko – Ramgarh Road (R-151 & R-152) under Chattogram Road Division

Location

Chattogram, Bangladesh

Start Date

August 2021

Completion Date

Ongoing

Description

Review of pavement design and preparation and review of bridge/culvert design. Ensure quality and quantity of works. Comprehensive supervision of project implementation activities carried out by the contractor(s) to ensure complete compliance with the drawings, technical specifications and various stipulations in the contract documents. Examine Interim Payment Certificate and BOQ of work done. Provide comments and engineering solutions regarding the problem originated during construction period. Monitor safeguards implementation includes health and safety activities associated with the project.

S – 3

Project Title

Improvement of Elenga-Hatikamrul-Rangpur to a 4-lane Highway under Korea Consultants International Co. Ltd.

Location

Tangail, Sirajganj and Rangpur, Bangladesh

Start Date

March 2019

Completion Date

Ongoing

Description

This project involves the upgrading of existing 2-lane 190.40 km road starting from Elenga to Rangpur to a 4-lane highway with slow moving vehicular traffic (SMVT) lane on both sides. The project work consists improvement of 190.40 km road and civil works in the contracts which includes 26 bridges of 1461 m, 3 flyovers of 635 m and a railway overpass of 411 m. Additionally, this project includes construction of 11 numbers of steel foot over bridge and 161 box culverts with length of 397 and 1102 m respectively.

S – 4

Project Title

Consultancy (CSC) Service for the “Widening of Road and Construction of Elevated Road from Panchaboti to Mukterpur Bridge”

Location

Narayanganj, Bangladesh

Start Date

April 2022

Completion Date

Ongoing

Description

Widening of 10.75 km road from existing 6 m wide to 2-lane with service road. Construction of 2-lane 9.06 km long elevated expressway. Also, widening of existing bridges and construction of bridge and culvert. Construction of toll plaza, police station and engineers’ accommodation facilities. Construction of toll plazas, toll monitoring building and installation of weigh scale.

S – 5

Project Title

Program for Supporting Rural Bridges (SupRB), Contract Package No. SD22-1 (Dhaka Division)

Location

Gazipur, Rajbari, Faridpur, Munshiganj, Manikganj, Madaripur, Kishoreganj, Gopalganj, Bangladesh

Start Date

November 2023

Completion Date

Ongoing

Description

The program is implemented by the Local Government Engineering Department (LGED) through the Project Director’s office and contract administration of civil works are carried out by LGED district/upazila offices. The program is implemented in total 61 districts out of 64 districts of the country, except three hill districts at a cost of USD 614 million. World Bank has a commitment to contribute in reducing the maintenance backlog of rural bridges by funding the proposed Program for Supporting Rural Bridges (SupRB).

S – 6

Project Title

Detail Design, Drawing and Construction Supervision including other Incidental Works for Construction of Integrated Flyover at Bornali, Bondho Gate and New Bismillah Railway Crossing Along Recently Completed 4 Lane Road under the Project “Integrated Urban Infrastructure Development in Rajshahi City” (LOT-B)

Location

Rajshahi, Bangladesh

Start Date

August 2021

Completion Date

Ongoing

Description

Preparation of preliminary plan and design for each flyover, preparation of final plan, elevation, section and 3D perspective view, preparation of detailed engineering design and drawing, preparation detailed cost estimated with bill of quantities, preparation of tender document and pre-qualification documents. Assist tender and pre-qualification evaluation for each flyover and construction supervision for each flyover.

S – 7

Project Title

Detail Design, Drawing and Construction Supervision including other Incidental Works for Construction of 4 no’s Flyover at Different Railway Crossing under the Project “Integrated Urban Infrastructure Development in Rajshahi City” (LOT-C)

Location

Rajshahi, Bangladesh

Start Date

August 2021

Completion Date

Ongoing

Description

Preparation of preliminary plan and design for each flyover, preparation of final plan, elevation, section and 3D perspective view, preparation of detailed engineering design and drawing, preparation detailed cost estimated with bill of quantities, preparation of tender document and pre-qualification documents. Assist tender and pre-qualification evaluation for each flyover and construction supervision for each flyover.

S – 8

Project Title

Consultancy Services for the Project “Expansion of Chattogram Shah Amanat International Airport (Design Review)”

Location

Chattogram, Bangladesh

Start Date

November 2022

Completion Date

Ongoing

Description

Shah Amanat International Airport is the second largest international airport in Bangladesh situated in the south-eastern port city of Chittagong. The airport is located in the Patenga area of the city, 20 kilometres (13-mile 11 NM) west from the city’s main commercial hub, GEC Circle and 18.5 km south of the city’s railway station on the north bank of the Karnaphuli River. With the existing facilities, the airport is not capable of handling growing air traffic demand. For this, CAAB intends to conduct detailed feasibility study, prepare new master plan for a period of next 50 years, prepare detailed design drawing etc. of the infrastructures required to meet growing air traffic demand of the country under the project.